eng

  • DBS Autosampler
  • PicoOnlineSPE System
  • YL6100 PC 1
  • Ecosec Offen72
  • Osmomat3000
  • Interchim Puriflash

instrumenter

ROXY qualification procedures

ROXY qualification procedures

Description


IQ - Installation Qualification
PQ - Performance Qualification-
OQ - Operational Qualification

Antec developed procedures and kits for Installation Qualification (IQ), Performance Qualification (PQ) and Operational Qualification (OQ) for ALEXYS and ROXY systems and system components. An IQ consists of a list of requirements prior to installation, and a checklist covering the delivery and instructions for use. The IQ is nothing more than a document that needs to be signed upon succesful installation. The PQ checks the most crucial criteria for performance. It starts with a dummy cell test, followed by a test using a test substance. The OQ is a check of performance specifications and calibration parameters of a device. There is no chromatography involved and the reactor cell is not included in this test.

It is advisable to do an OQ followed by a system PQ after preventive maintenance of wear and tear parts, preferrably once a year.

  • Logo1
  • Logo10
  • Logo11
  • Logo12
  • Logo13
  • Logo14
  • Logo2
  • Logo3
  • Logo4
  • Logo5
  • Logo6
  • Logo7
  • Logo8
  • Logo9

  eng